Type of project: Transformation of an office tower built in 1964
Type of building: Office
Construction materials: Concrete, steel, aluminium, wood
Building energy reference area (ERA): 7862 m²
Floors: 18
Location: Les Acacias (GE), CH
Project phase: Completed in may 2023
1390
kg/m²362
kg CO2-eq./m²0.3
kg C/m²192
kg CO2-eq./m²0.1
% of total mass91
% of total mass0
km (weighted average)
⚠ Changing the visibility of the columns can mess the table display. 🔧To re-arrange the columns, double-click on the "n°" column's title.